Track Bulletin 6900
================================================================================
. SP .
. TRACK BULLETIN FORM C NUMBER 6900 FEB 22 1996 .
. TO: 7335 WEST .
. AT KLAMATH FALLS .
================================================================================
. DIVISION GENERAL ORDER NO 20 ITEM 8 PART READING: (001)
. RULE29.13 AC LOCOMOTIVES (002)
. IS REVISED TO READ: (003)
. RULE 29.14 AC LOCOMOTIVES (004)
. (005)
. DIVISION GENERAL ORDER NO 20 ITEM 14 PART READING: (006)
. RULE 50.35 DIESEL ENGINE COOLING (007)
. IS REVISED TO READ: (008)
. RULE 50.34 DIESEL ENGINE COOLING (009)
. (010)
. RULES AND INSTRUCTIONS GOVERNING AIR BRAKE SYSTEMS AND TRAIN HANDLING, (011)
. RULE 51.15 RUNNING AIR TEST PART A, PAGE 54 IS REVISED TO READ AS (012)
. FOLLOWS: (013)
. A. FREIGHT TRAINS. (014)
. BEFORE CRESTING A GRADE WHERE AIR BRAKES MAY BE REQUIRED TO BALANCE (015)
. GRADE, THE ENGINEER MUST APPLY THE TRAIN BRAKES TO DETERMINE THAT (016)
. BRAKES ARE OPERATING PROPERLY. (017)
. IF THE AIR BRAKES DO NOT OPERATE PROPERLY, THE TRAIN MUST BE STOPPED (018)
. AND CAUSE OF THE FAILURE DETERMINED AND CORRECTED. (019)
. (020)
. ROSEVILLE DIVISION GENERAL ORDER NO. 20 IS EFFECTIVE FEBRUARY 15, 1996 (021)
. INSTEAD OF FEBRUARY 15, 1995 (022)
--------------------------------------------------------------------------------
. COMPLETE: 901 AM (022 LINES) LIT TRAIN DISPATCHER .
--------------------------------------------------------------------------------