The next few images will focus on detailing the Details West #140 snowplow.
First we will start by drilling a .042" hole between the coupler opening and the mu pass-through opening on the conductor's side of the plow. Next, using the same drill bit, carefully saw back and forth, elongating the hole. This will allow the DW #267 trainline hose to fit through the plow as per the prototype.